The Board of Directors approved renovation of the women’s bathroom prior to the 2017 season. The renovation has several aspects. For the showers, the renovation replaces the shower tiling, the drain system, the plumbing, raises and replaces the floor, and adds shower curtains for each individual shower for privacy.
The renovation also replaces all of the toilet stall doors and partitions and replaces the vanity and plumbing for the sinks. The renovation applies a stronger epoxy (two coats) to the floor along with an anti-slip additive (light sand-based product that will give the floor grip). It also replaces the soap and paper towel dispensers, the lighting, possibly adds an overhead fan for moisture reduction, and finally repaints the entire bathroom.